English
Pусский
Español
Português
Polski
Türk dili
Melayu
Bahasa indonesia
हिन्दी
Українська
o'zbek

You are here: Home / Press Room / Daily Production Of CBM Vertical Well Breaks 1000 M3 In Qinbei Basin

Daily Production Of CBM Vertical Well Breaks 1000 M3 In Qinbei Basin

Publish Time: 2021-12-02     Origin: Site

Trial production of surface CBM well is the key link to realize exploration and conversion production. From 2019 to 2021, CCTEG Xi 'an Research Institute undertook "Coal-bed methane Exploration Project of Wenjiazhuang Mine" technology transformation project of Huayang New Material Technology Group Co., LTD. Up to now, four CBM test wells have entered the drainage stage. Among them, PS06 well has a daily gas output of 1159m3. The other three coalbed methane trial wells have started producing with quite positive gas potential. The successful implementation of the project has strengthened the determination of ground pre-drainage gas control in this region and laid a good foundation for the follow-up cooperation between the two sides.

CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

CONTACT US

 Tel: +86-15829664021
 After-sales Tel: +86-400-029-6999
 E-mail: liangma0318@gmail.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️  2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved.  Sitemap I  Privacy Policy