English
Pусский
Español
Português
Polski
Türk dili
Melayu
Bahasa indonesia
हिन्दी
Українська
o'zbek

You are here: Home / Press Room / Deputy General Manager, Wang Hong Do The Geothermal Test And Guide The Site Work In The Xi'an Research Institute

Deputy General Manager, Wang Hong Do The Geothermal Test And Guide The Site Work In The Xi'an Research Institute

Publish Time: 2019-03-29     Origin: Site

On March 28th, Wang Hong, the deputy general manager do the geothermal test and guide the site work in the Xi'an Research Institute during review meeting. Deputy general manager Wang Hong, accompanied by Zhang Qun, the former deputy general manager of Xi'an Research Institute, and Xu Haohai, director of the Engineering Institute, visited the construction site of the geothermal test well. Project Manager Zhang Weidong gave a detailed introduction to the test well structure, drilling equipment, environmental protection measures and schedule. At present, the drilling equipment has been installed and commissioned, other construction preparations have been basically completed, and it is planned to start in the near future. Deputy General Manager Wang Hong affirmed the preliminary work of the project. He also stressed that the development of geothermal industry is a good direction. In addition to geothermal heating, medium and low temperature geothermal power generation can be considered in the future. Xi'an Research Institute should use its comprehensive advantages to develop. For the geothermal industry, the group company will also give strong support.


CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

CONTACT US

 Tel: +86-15829664021
 After-sales Tel: +86-400-029-6999
 E-mail: liangma0318@gmail.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️  2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved.  Sitemap I  Privacy Policy