English
Pусский
Español
Português
Polski
Türk dili
Melayu
Bahasa indonesia
हिन्दी
Українська
o'zbek

You are here: Home / Press Room / Mine Water Of Xizhuo Coal Mine Of Shaanxi Shaanxi Coal Chenghe Mining Co., Ltd. And Domestic Sewage Treatment Station Description Of Works

Mine Water Of Xizhuo Coal Mine Of Shaanxi Shaanxi Coal Chenghe Mining Co., Ltd. And Domestic Sewage Treatment Station Description Of Works

Publish Time: 2024-03-11     Origin: Site

The EPC General Contracting Project of Mine Water and Domestic Sewage Treatment Station in Xizhuo Coal Mine of Shaanxi Shaanxi Coal Chenghe Mining Co., Ltd. includes the mine water treatment station and domestic sewage treatment station in Xizhuo Coal Mine, with a total contract amount of RMB 97.88 million. The mine water treatment capacity is 1500m3/h, including four individual buildings: pretreatment workshop, comprehensive water treatment room, water purification workshop and sludge dewatering room, with a total construction area of 7850.77m2. The mine water adopts the treatment process of "pre-sedimentation regulation → coagulation sedimentation → activated sand filtration → ultrafiltration → reverse osmosis → disinfection → reuse". After being treated, the underground water meets the water quality standards of Integrated Wastewater Discharge Standard of Yellow River Basin in Shaanxi Province (DB61/224-2018) and Emission Standard of Pollutants for Coal Industry GB20426-2006. The domestic sewage treatment capacity is 40m3/h, including three single buildings: collecting tank, domestic water treatment tank and auxiliary room, with a total construction area of 393.58m2. The domestic sewage treatment process adopts the treatment process of "grille → collecting well → regulating tank → AAO → coagulation sedimentation → rotary disc filtration → disinfection → reuse", and the treated effluent meets the urban greening standard in Reuse of Urban Recycling Water-Water Quality Standard for Urban Miscellaneous Water Consumption (GB/T18920-2002).

Up to now, the civil works and equipment installation of the Project have been completed, the joint commissioning of the system has been completed, the effluent quality has passed the inspection, and the project has passed the completion acceptance by all levels of quality supervision and construction units and been handed over for operation.

CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

CONTACT US

 Tel: +86-15829664021
 After-sales Tel: +86-400-029-6999
 E-mail: liangma0318@gmail.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️  2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved.  Sitemap I  Privacy Policy