English
Pусский
Español
Português
Polski
Türk dili
Melayu
Bahasa indonesia
हिन्दी
Українська
o'zbek

You are here: Home / Press Room / Company News / Mine Water Hazard Risk Assessment And Comprehensive Prevention & Control Platform Developed by CCTEG Xi'an Research Institute Successfully Passed Acceptance Inspection

Mine Water Hazard Risk Assessment And Comprehensive Prevention & Control Platform Developed by CCTEG Xi'an Research Institute Successfully Passed Acceptance Inspection

Publish Time: 2026-09-10     Origin: Site

Recently, the Mine Water Hazard Risk Assessment and Comprehensive Prevention & Control Platform, led and developed by CCTEG Xi'an Research Institute, has officially passed customer acceptance.

This successful acceptance marks the platform's official launch and operation, opening a new chapter in the digital and intelligent prevention and control of mine water hazards.

Supported by multiple core technologies, the platform has built a systematic and intelligent analysis, prevention, and control system for coal mine water hazards. It integrates multiple functions including hydrogeological information management, water hazard monitoring and early warning, risk assessment and prediction, and intelligent observation of water-drainage boreholes, comprehensively improving the effect of mine water hazard prevention and control.

Specifically, the online water quality discrimination module relies on a local water source database to achieve a 95% abnormal identification rate for water samples from goafs. The dynamic water inflow prediction module is trained using deep learning models, achieving over 85% accuracy in predicting water inflow during working-face mining. Full digitalization has been achieved for tasks such as water inrush risk zoning and aquifer water-richness evaluation, reducing the evaluation drawing drafting cycle from 3–5 days to 2 hours. The water-drainage borehole design function based on the 3D geological model operates stably, with borehole trajectory design accuracy comparable to manual standards. The design time for a single borehole has dropped from half a day to 30 minutes, sharply increasing operational efficiency.

CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

CONTACT US

 Tel: +86-15829664021
 After-sales Tel: +86-400-029-6999
 E-mail: liangma0318@gmail.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️  2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved.  Sitemap I  Privacy Policy