+86-29-81778206 / 81778300       jingying@cctegxian.com
You are here: Home / Press Room / Baowu Iron And Steel Co., Ltd. Wins The First Battle Of Water Shutoff, Xi'an Research Institute Gains More Achievements

Baowu Iron And Steel Co., Ltd. Wins The First Battle Of Water Shutoff, Xi'an Research Institute Gains More Achievements

Views: 0     Author: Site Editor     Publish Time: 2020-07-06      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button

water hazard management

Xi'an Research Institute gains more achievements

At 12 o'clock on June 16, 2020, at the Gushan Mine of China Baowu Iron and Steel Group Magang Group, with the buzzing of the auxiliary well drainage pump, all the personnel of the Magang Project Department of the Hydrology Institute of Xi'an Research Institute were busy in an orderly manner , -160m, -200m, -250m, -300m... As the water level of the drainage well continued to drop to -348.6m, the water level of the observation hole remained immobile, the dangling hearts of the personnel at the scene were finally released, the Gushan mine was successfully drained The grouting and water blocking project won the first battle. After more than 80 days of hard work and overcoming difficulties, we finally ushered in this moment of victory, marking that Xi'an Research Institute has made more achievements in the field of non-coal mine water hazard prevention!

At 13:44 on Dec. 22, 2019, water inrush occurred in the roadway of Gushan Iron Mine, Gushan Mining Co., Ltd. -300m horizontal distance to 273.5m of filling well center point. The instantaneous water inrush was 6340m3/h, exceeding the maximum drainage capacity of the mine, and the underground roadways and equipment were flooded which is a rare water inrush inundation accident in the history of Maanshan Iron and Steel Group.

After receiving the invitation from Ma Gang Group for technical support, Xi'an Research Institute attached great importance and responded quickly. Zheng Shitian, an expert in water prevention and control of Xi'an Research Institute, and Shi Zhiyuan, vice director of Hydrology Institute, rushed to the site immediately to consult data, analyze conditions, make plans, organize personnel and equip equipment.

Gushan Iron Ore Grouting and Water Blocking Project is the first cooperation between Xi'an Research Institute and Baowu Iron and Steel Group of China. The success of water closure and water blocking is highly praised by the mine, which lays a solid foundation for further and continuous cooperation between Xi'an Research Institute and Baowu Iron and Steel Group of China in water hazard management.


If you want know more, please contact: international@cctegxian.com


CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-29-81778206 / 81778300
 After-sales Tel: +86-400-029-699
 E-mail: jingying@cctegxian.com
xiaoshou@cctegxian.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy