+86-29-81778206 / 81778300       jingying@cctegxian.com
You are here: Home / Press Room / CCTEG Xi'an Research Institute Received A Letter Of Thanks And A Banner From Xi'an Thermoelectric New Energy Co., Ltd.

CCTEG Xi'an Research Institute Received A Letter Of Thanks And A Banner From Xi'an Thermoelectric New Energy Co., Ltd.

Views: 0     Author: Site Editor     Publish Time: 2024-04-15      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button

Recently, CCTEG Xi'an Research Institute received a letter of thanks and a banner from Xi'an Thermoelectric New Energy Co., LTD. In the letter, CCTEG Xi'an Research Institute was expressed recognition and gratitude for the efforts and contributions in the geothermal and solar multi-energy complementary demonstration project of Epang Palace Elderly Care Apartment and Elderly Care Service Center in Xi'an construction industry, Xi'an Thermoelectric New Energy Co., Ltd. hoped to continue to jointly promote the development of geothermal energy with CCTEG Xi'an Research Institute in the future. To contribute to the realization of the national "double carbon target".

news-554-380

Since the EPC project general contract was signed, CCTEG Xi'an Research Institute quickly organized management team and technical personnel into the project, despite the challenges such as site cross-construction and large demand for manpower, CCTEG Xi'an Research Institute still completed the outdoor construction of 742 geothermal buried pipes, and quickly started the construction of energy station. The project finally had the conditions for energy supply before the end of the year, which was affirmed by the construction side.

This demonstration project integrates a variety of energy sources such as geothermal energy and solar energy. Through the ground temperature monitoring, intelligent control and photothermal system, the buried pipe zoning control and the dynamic control function of solar heat replenishment are realized. In the construction process, BIM design and modular assembly construction of energy station system are adopted, which greatly improves the construction efficiency. The project also established a smart energy management and control platform to realize transparent system operation, digital monitoring and real-time control automation, optimize energy allocation and improve the efficiency of comprehensive energy use.

This project fully demonstrates the technical strength of CCTEG Xi'an Research Institute in the development and utilization of geothermal energy and the project management capability of high efficiency, high quality and high safety. In the future, CCTEG Xi'an Research Institute will always practice the concept of green and low-carbon development, and contribute to the realization of the national "double carbon goal"!

CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-29-81778206 / 81778300
 After-sales Tel: +86-400-029-699
 E-mail: jingying@cctegxian.com
xiaoshou@cctegxian.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy