On March 28th, Wang Hong, the deputy general manager do the geothermal test and guide the site work in the Xi'an Research Institute during review meeting. Deputy general manager Wang Hong, accompanied by Zhang Qun, the former deputy general manager of Xi'an Research Institute, and Xu Haohai, director of the Engineering Institute, visited the construction site of the geothermal test well. Project Manager Zhang Weidong gave a detailed introduction to the test well structure, drilling equipment, environmental protection measures and schedule. At present, the drilling equipment has been installed and commissioned, other construction preparations have been basically completed, and it is planned to start in the near future. Deputy General Manager Wang Hong affirmed the preliminary work of the project. He also stressed that the development of geothermal industry is a good direction. In addition to geothermal heating, medium and low temperature geothermal power generation can be considered in the future. Xi'an Research Institute should use its comprehensive advantages to develop. For the geothermal industry, the group company will also give strong support.