In accordance with the relevant requirements of the Xi'an Research Institute, each department has formulated countermeasures and work plans to ensure the scientific research work to be carried out in an orderly manner.
Drilling R & D Center
In order to complete the design task on time, the relevant technical personnel during the epidemic persisted in their positions and carried out the design of the drawings carefully.
Geophysical Exploration R & D Center
The Geophysical Prospecting R & D Center strictly implements various regulations on epidemic prevention and control, they resumes work in an orderly manner. The person in charge of the center and the office staff are on duty all day, and the rest are on rotation, some of them go to work and some of them work online at home.
Hydrogeology Engineering and environment protection R & D Center
In order to ensure that various scientific research work is carried out on schedule and completed on time, the following measures have been taken. First, the R & D department arranges and refines the tasks throughout the year. They formulate a weekly work plan, adjust the research sequence in accordance with the epidemic prevention and control situation, and arrange the required personnel to return to work. Second, special arrangements have been made for the national key R & D plan project about "Rapid identification of mine water inrush and research on key technologies for flood prevention and control" and the research of the subject. The third is to set up a document sharing group for researchers who work at home.