On the afternoon of March 3, Xianping Ma, Party working committee secretary of Xi'an High-tech Industrial Development Zone, and her party investigated the intelligent drilling equipment and coalbed methane development industrial base of CCTEG Xi'an Research Institute (the project of High-tech West Campus). Ningping Yao (general manager), Zhuanglu Zhang (deputy general manager) and heads of relevant departments participated in the survey.
Ma and her entourage visited the intelligent manufacturing workshop of drilling equipment, and listened carefully to the introduction of the operation situation.
At the construction site, Ma and her party also listened to the introduction of the overall planning and construction of CCTEG-Xi'an High-tech West Campus Project. Ma fully affirmed the development and contribution of CCTEG-Xi'an in the high-tech zone for more than ten years, and spoke highly of the grand goal and achievements of the company’s continuous efforts to develop the equipment manufacturing industry and to build a "smart manufacturing digital factory".
The high-tech west campus project covers an area of about 126,730 square meters, with a total construction area of about 98,000 square meters and a total investment of about 703.89 million yuan. The first phase of the project includes workshops, joint station buildings, etc. It was completed and put into production in 2019 and has been shortlisted for the "Ministry of Industry and Information Technology Intelligent Manufacturing Demonstration Factory". The continuation project includes a comprehensive building, workshops and supporting buildings, and is expected to be completed and put into use in 2023. CCTEG-Xi'an will continue to speed up the project construction, make every effort to build an intelligent manufacturing lighthouse factory in the industry segment, and contribute to the high-quality development of the economic industry in the high-tech zone.