On June 21, Liu Cheng, deputy general manager of Xi'an Research Institute, went to the Sangshuping Mine in Hancheng to carry out safety inspection on the project of "3 coal seam top plate directional long-drilling hydraulic fracturing pumping gas" project of Hancheng Sangshuping II well jointly undertaken by the geological gas institute, drilling institute and research and development center.
At the project site, Liu Cheng, Sun Siqing, deputy director of the Geological Gas Institute, and Wang Yunhong, deputy director of the Geophysical Prospecting R&D Center, and other relevant personnel went deep into the underground construction site of the South Rail Track, He listened to the project leader Chen Dongdong's introduction to the project overview, project progress and work safety management, etc.He inspected safety precautions such as civilized production, fire fighting equipment, gas monitoring and extraction, personal protection, etc. on the spot, and talked with front-line construction personnel. In the project department, Liu Cheng carried out a comprehensive and systematic inspection of the project safety production materials.
Liu Cheng gave full recognition to the safe production of the Hancheng Sangshuping project, while emphasizing that the project is located in the Hancheng mining area where the gas geological conditions are complex, and the implementation of the mine is adjacent to the Yellow River, requiring the project department to do a good job of underground safe and civilized production, pay attention to the rainy season flood control, epidemic prevention and control and personnel travel safety.
If you want know more, please contact: international@cctegxian.com