+86-15829664021      
 liangma0318@gmail.com
You are here: Home / Press Room / Company News / The Advanced Regional Exploration And Control Project for Limestone Water Hazards in The Coal Seam Floor of The Northern Wing of Panel 2 at Suancigou Coal Mine, Undertaken by CCTEG Xi'an Research Inst

The Advanced Regional Exploration And Control Project for Limestone Water Hazards in The Coal Seam Floor of The Northern Wing of Panel 2 at Suancigou Coal Mine, Undertaken by CCTEG Xi'an Research Inst

Views: 0     Author: Site Editor     Publish Time: 2025-12-16      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button

Recently, the project "Advanced Regional Exploration and Control of Limestone Water Hazards in the Coal Seam Floor of the Northern Wing of Panel 2 at Suancigou Coal Mine" – undertaken by CCTEG Xi'an Research Institute – was officially launched in Jungar Banner, Ordos City. Over 70 people attended the groundbreaking ceremony, including leaders and relevant technical personnel from CCTEG Xi'an Research Institute, Yitai Group, and Suancigou Mining Company.

1

This project is not only the largest-scale water hazard control project in the Jungar Mining Area to date, but also the first ground-based regional comprehensive water hazard control project ever implemented at Suancigou Coal Mine. The construction plan of this project breaks through the traditional water hazard prevention and control model; once completed, it will systematically drive the "three transformations" in prevention and control strategies: from passive prevention to active control, from local treatment to regional governance, and from post-event remediation to advanced prevention.

Technical experts from CCTEG Xi'an Research Institute have carried out extensive preparatory work at the front lines of the Jungar Coalfield and the Suancigou Coal Mine. Ranging from the collection of basic geology data to the precise construction of directional drilling and the scientific implementation of grouting treatment, these efforts have laid a solid foundation for the control plan's scientific validity and feasibility.

CCTEG Xi'an Research Institute will continue to build a water hazard prevention and control technology system, strengthen the in-depth integration of water hazard prevention technology R&D and engineering practice, and provide multi-hazard, cross-field collaborative prevention and control solutions for more mines with complex geological conditions, thereby safeguarding mine safety.


CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-15829664021
 After-sales Tel: +86-400-029-6999
 E-mail: liangma0318@gmail.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy