Geological Survey And Treatment Engineering Of Goaf
Geological Survey And Treatment Engineering Of Goaf Geological Survey And Treatment Engineering Of Goaf

loading

Geological Survey And Treatment Engineering Of Goaf

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button
1
Quantity:

Geological survey and treatment engineering of coal mine goaf

1. Introduction

During the construction of the industrial square of measures well in the north wing of Ningtiaota Coal Mine, there are many cracks and collapse deformation in the site, among which the maximum subsidence of the coal tower is 790mm, and cracks appear in the concrete structure. It is found that the coal 2-2 below the site has a goaf of a small mine, and the site conditions are unstable. As a large industrial site, there is a huge potential safety hazard.

 2020-12-25 142719

Figure 1 Site cracks Figure 2 Coal tower sinking

2. Treatment solution

According to the characteristics of the goaf, the treatment project adopted the technology of one-time hole forming, full hole intermittent full filling grouting and sand injection. The distance between the boreholes is 10-15m, and the grouting holes are preferentially arranged in the goaf roadway and the building foundation. The grouting material is composed of paste slurry and cement fly ash slurry.

3. Construction situation

The drilling of 12975m / 204 holes was completed, with 14400m3 of sand and 715m3 of grout (50989m3 of cement fly ash slurry and 20726m3 of paste slurry).

 2020-12-25 142839

Figure3 Paste grouting construction Figure4 Cement fly ash grouting construction


 2020-12-25 142950

Figure 5 Construction layout plan

4. Achieved accomplishment

After construction, the inspection holes were all free of water leakage and drilling fluid loss. The slurry structure effectively filled the underground goaf area, which plays a better role of reinforcement and support. At present, the industrial site has been completed and put into use

 2020-12-25 143049

Figure5 Site of coal tower and screening workshop Figure6 Hot blast furnace room and driving machine room

5. FAQ

What are the advantages of paste material grouting and traditional cement fly ash grouting?

A: Paste material filling is a new filling treatment method developed by our institute. In this project, local rich aeolian sand is selected as the main material according to local conditions, which is mixed by the concrete mixing station, and the cost of pulping is low. It is suitable for curtain hole and borehole with a height of more than 0.5m.


Hot Tags: geological survey and treatment engineering of goaf, China, manufacturers, suppliers, factory, wholesale, price list, buy, for sale,

Previous: 
Next: 
CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-29-81778206 / 81778300
 After-sales Tel: +86-400-029-699
 E-mail: jingying@cctegxian.com
xiaoshou@cctegxian.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy