+86-29-81778206 / 81778300       jingying@cctegxian.com
Products & Services Company
You are here: Home / Products & Services / Mine Water Hazard Prevention & Control / Comprehensive Hydrogeological Research / Mine Water Hazard Control Planning
Mine Water Hazard Control Planning
Mine Water Hazard Control Planning Mine Water Hazard Control Planning

loading

Mine Water Hazard Control Planning

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button
1
Quantity:

Mine water hazard control planning

1. Introduction

Mine water prevention and control plan is a guiding report that serves mine water prevention and control work, guides proper technical management and project implementation for mine water prevention and control, ensures the scientificity, pertinence and effectiveness of water prevention and control works, and prevents and reduces water hazards. It is the main basis for the fund raising, project implementation and work arrangement related to mine water prevention and control.

2. Main Contents

Mine water control plan shall include the following contents:

(1) physical geography, location and transportation and surroundings of the mine, production status and mining planning;

(2) review of previous geological and hydrogeological work;

(3) regional and mine geological conditions;

(4) hydrogeological conditions of the region and the mine field, and analysis of mine water filling factors;

(5) prediction of mine water inflow and evaluation of drainage system in planning stage;

(6) main hidden dangers and problems of mine water hazards in the planning stage;

(7) overall planning ideas;

(8) major water control works to be carried out during the planning stage and the project planning;

(9) work arrangement and cost estimate in relation to water prevention and control in the planning stage;

(10) layout of water prevention and control works in the planning stage.

3. Typical Projects

CCTEG Xi’an Research Institute Co., Ltd. has developed more than 100 mine water prevention and control plans, and coal enterprises and coal mines that had such planning carried out various water prevention and control works scientifically, efficiently and orderly, without mine water safety accidents.

For example, CCTEG Xi’an prepared a comprehensive water prevention and control planning report for 18 mines in Yanquan Coal Industry Group Headquarters. The mining areas were distributed in 7 counties and districts of Yangquan City and Jinzhong City, Shanxi Province, covering the northeast of Qinshui Coalfield, an oversize coal-gathering basin, as shown in Figure 1. The report systematically analyzed the water-filling factors such as water-filling sources and water-filling channels of various mines, identified the main hidden dangers and problems of water hazards faced by mines, and developed detailed water prevention and control work plans. At the beginning of the year, Yangquan Coal Mine Group prepared the annual water prevention and control plan for 18 pairs of mines based on our water prevention and control plan and organized its implementation, which ensured the orderly development of various water prevention and control works, effectively curbed the occurrence of accidents and ensured the safety of water prevention and control in all mines.


4. FAQ

Q1: How many years is needed for the planning stage of mine water prevention and control plan?

A: According to the relevant requirements of Rules for Coal Mine Water Prevention and Control, the planning stage of mine water prevention and control is generally 5 years, and shall be amended when there are new water prevention and control problems in mines and major adjustments to the mining plan.


Q2: What are the principles for the preparation of mine water prevention and control plans?

A: Medium-and long-term mine water prevention and control planning should adhere to the principles of people-oriented, prevention first, solid foundation, comprehensive measures, giving consideration to both hard and soft, advanced concept and scientific and technological innovation.


Q3: What is the organization mode of mine water prevention and control plan?

A: Mine water prevention and control plan is generally prepared jointly by coal enterprises (mines) and professional institutions or universities, reviewed by the chief engineer of coal enterprises (mines), and approved by the chief engineer of coal enterprises.

 2020-12-31 093554

Figure 1 Map of Mine Distribution of Yangquan Coal Industry Group



Hot Tags: mine water hazard control planning, China, manufacturers, suppliers, factory, wholesale, price list, buy, for sale,

Previous: 
Next: 
CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-29-81778206 / 81778300
 After-sales Tel: +86-400-029-699
 E-mail: jingying@cctegxian.com
xiaoshou@cctegxian.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy