+86-29-81778206 / 81778300       jingying@cctegxian.com
Products & Services Company
You are here: Home / Products & Services / Mine Water Hazard Prevention & Control / Docking Well
Docking Well
Docking Well Docking Well

loading

Docking Well

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button
1. Introduction In some coalfields, due to the high cost of ground drainage, potential environmental pollution risk, land acquisition and transportation difficulty, etc., it is cost-efficient to change gas drainage from ground to underground and connect to the existing underground gas drainage...
Quantity:

1. Introduction

In some coalfields, due to the high cost of ground drainage, potential environmental pollution risk, land acquisition and transportation difficulty, etc., it is cost-efficient to change gas drainage from ground to underground and connect to the existing underground gas drainage system to conduct high efficient gas extraction in coal seam.

2. Minewater hazard treatment solution

Adopting ZDY12000LD drilling rig, BLY460 mud pump truck and YHD3-1500 mud pulse wireless measurement while drilling system independently developed by CCTEG Xi’an Research Institute, borehole drilling trajectory control and precise docking of ground well and underground borehole were realized.

3. Construction Situation

Composite directional drilling technology and active magnetic ranging technology were used for docking guidance. A Φ120 mm horizontal directional long borehole along the No. 8 coal seam was constructed. Borehole total footage was 1988m. It docked with surface U-shaped well group Shenhuaping-01V successfully at 1544 meter. Relative high efficient gas drainage effect was achieved.

4. Achieved accomplishment

The remote horizontal docking technology in underground coal mines comprehensively applies mud pulse wireless measurement while drilling compound directional drilling technology and active magnetic ranging technology to achieve trajectory control, precise docking and penetration, and expand the application field of horizontal directional long boreholes in underground coal mines. The mud pulse wireless measurement while drilling system and the RMRS docking system and its supporting equipment also provide guidance for the implementation of the remote horizontal docking borehole connection. The project has significantly improved the extraction efficiency of surface CBM well groups, reduced drainage costs and land acquisition costs, and established a three-dimensional combined underground and surface extraction mode.

5. FAQ

Q1: Which technologies are used to achieve precise connection of underground directional drilling and surface U-shaped wells?

A: Mud pulse wireless measurement while drilling compound directional drilling technology and active magnetic ranging technology are used to achieve trajectory control and precise docking.

Q2: What kind of work can your company do in this field?

A: We can solve the main gas drainage personalization problems encountered in the process of mine exploration, construction, production and shutdown.

Q3: What are the advantages of your company compared with other companies?

A: We are committed to the research of wireless measurement while drilling directional drilling technology and docking technology, and have formed a complete set of directional drilling and surface U-shaped well docking technology and equipment.




Hot Tags: docking well, China, manufacturers, suppliers, factory, wholesale, price list, buy, for sale,

Previous: 
Next: 

Related Products

CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-29-81778206 / 81778300
 After-sales Tel: +86-400-029-699
 E-mail: jingying@cctegxian.com
xiaoshou@cctegxian.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy