+86-29-81778206 / 81778300       jingying@cctegxian.com
Products & Services Company
You are here: Home / Products & Services / Mine Water Hazard Prevention & Control / UIS Drilling
UIS Drilling
UIS Drilling UIS Drilling

loading

UIS Drilling

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button
1. Introduction The pre-mining gas control model in Baode Coal Mine’s large-panel working face requires that inseam directional drilling borehole can reach more than 3 000m. The existing technical equipment still have problems such as large water pressure consumption, limited transmission...
Quantity:

1. Introduction

The pre-mining gas control model in Baode Coal Mine’s large-panel working face requires that inseam directional drilling borehole can reach more than 3 000m. The existing technical equipment still have problems such as large water pressure consumption, limited transmission distance of wired measurement while drilling signals, and inability to recycle the drill fluid, which restricted the development of directional drilling along the coal seam.

2. Treatment solution

Sliding drilling drag reduction technology based on downhole motor hydraulic pressure and super long drilling tool forward and reverse torsion feed, and composite drilling trajectory control technology based on rotary drilling inclination angle control were developed. A low-pressure water consumption water inlet system, a mud pulse wireless measurement while drilling system and a flushing fluid purification circulation system were also designed. In accordance with the production needs of Baode Coal Mine, the construction of ultra-long through directional holes along the coal seam was carried out.

3. Construction situation

At No. 1 intake alley, section 27, Pentan district, Baode County Coal Mine, the directional drilling was carried out, adopting ZDY15000LD directional drilling equipment, YHD3-3000 type mud pulse wireless measurement while drilling system, high-strength non-cable directional drilling tool independently innovated by CCTEG Xi’an Research Institute. The drilling operation cost 21 days, to achieve a borehole depth of 3353m. Total drilling footage is 4428m with 120mm diameter. Borehole sidetracks reached roof and floor for 13 times. The error of target coordinate of drilling through the tunnel is less than 0.15%. At present, average daily gas extraction of the borehole is more than 5000m3.

4. Achieved accomplishment

The borehole broke inseam directional drilling depth record that created by CCTEG Xi ’an Research Institute in early 2019. It realized stable signal transmission of mud pulse wireless measurement while drilling (MWD) over 3000m deep and ultra-long distance high precision target hitting.

Industrial application of the newly developed flushing fluid purification circulation system for underground coal mines has solved the problem of large water consumption and large sewage discharge in the construction of ultra-long boreholes, and realized directional drilling flushing fluid to be transferred from "open" to "closed" cycle. The successful implementation of the 3353 m ultra-long inseam directional borehole drilling is a new milestone in the development of downhole motor directional drilling technology and equipment, indicates that we have reached the international leading level in this field. It is of great significance to promote the advancement of gas control in large areas of coal seams, the prevention of water hazards, and geological exploration.

5. FAQ

Q1: What technologies are used to realize ultra-long directional drilling along coal seam?

A: We have adopted the drag reduction technology of downhole motor hydraulic pressure and reverse twist feed of super-long drilling tools, as well as the control technology of dip angle of rotary drilling and the control technology of compound drilling trajectory of sidetracking branch. Low pressure water inlet system, mud pulse wireless measurement while drilling system and flushing liquid purification circulation system are also designed to realize the super-long inseam directional drilling.

Q2: What can your company do in this area?

A: We can solve the main gas drainage problems encountered in the process of mine exploration, construction, production and shut-down.

Q3: What advantages does your company have over other companies?

A: We are committed to the design and construction of coal seam gas control, and can supply comprehensive service of coal seam gas control technology and equipment.


Hot Tags: uis drilling, China, manufacturers, suppliers, factory, wholesale, price list, buy, for sale,

Previous: 
Next: 

Related Products

CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-29-81778206 / 81778300
 After-sales Tel: +86-400-029-699
 E-mail: jingying@cctegxian.com
xiaoshou@cctegxian.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy