Foundation Pit Dewatering Project For Architecture Building
Foundation Pit Dewatering Project For Architecture Building Foundation Pit Dewatering Project For Architecture Building
Foundation Pit Dewatering Project For Architecture Building Foundation Pit Dewatering Project For Architecture Building
Foundation Pit Dewatering Project For Architecture Building Foundation Pit Dewatering Project For Architecture Building
Foundation Pit Dewatering Project For Architecture Building Foundation Pit Dewatering Project For Architecture Building

loading

Foundation Pit Dewatering Project For Architecture Building

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button
1
Quantity:

Foundation pit support and dewatering project for Xian Science and Architecture Building

1. Introduction

The foundation pit was excavated vertically, with an average depth of 17.40m and a dewatering depth of 19.80m. In the process of foundation pit excavation and foundation pit dewatering, it was to ensure the safety of foundation pit and avoid the influence on the normal use of buildings and urban road around the foundation pit. At the same time the construction was difficult and long time limit for a project.

 2020-12-25 155953

Foundation pit plan


The foundation pit was excavated without fertilizer trough (vertical), with an average depth of 17.40m and a dewatering depth of 19.80m. In the foundation pit excavation and dewatering, it is necessary to ensure the safety of the foundation pit and avoid affecting the normal use of buildings around the foundation pit and urban roads. At the same time, the construction was difficult and the construction period was long.

2. Solution

In order to ensure the foundation pit deformation of surrounding structures in the range of security, prestressed anchor cable composite supporting structure was mainly used in the pile foundation pit. In order to ensure the excavation, the precipitation was controlled, the design and construction of the project were carried on carry on according to the principle of "informatization construction, dynamic design". Horizontal deformation monitoring was conducted for the supporting structure of the foundation pit, settlement observation was conducted for surrounding buildings and urban roads, and water level observation holes were set at key positions around the foundation pit to monitor the change of underground water level.


3. Construction situation

The total area of the foundation pit is 11,248m2, and the construction period was 120 days. 337 pile revetings with pile diameter 800mm and 14 pile revetings with pile diameter 600mm were completed, total volume of 3,690.3 m3; 260.9 m3 crown beam, 21,953m anchor cable, 995.6m2 soil nailing wall support, 9,272.11 m2 shotcrete were completed. Foundation pit dewatering took 2 years.

22

Construction site of rotary excavation and drilling construction of revetment pile

33

Pre-stressed anchor cable


The total area of foundation pit is 11248m2, and the construction period was 120 days.337 slope protection piles with a pile diameter of 800mm and 14 slope protection piles with a pile diameter of 600mm have been completed and concrete of 3690.3 m3in total has been poured; crown beams (260.9 m3), anchor cables (21,953m), soil nailing wall support (995.6m2) and sprayed concrete (9272.11 m2) have been completed. Foundation pit dewatering lasted for 2 years.

4. Achieved accomplishment

The project has been completed safely and successfully, with qualified construction quality, in line with national and industrial engineering construction acceptance codes and relevant requirements of construction units, ensuring the safety of surrounding buildings and urban roads; After the completion of the project, significant economic and social benefits will be generated, providing technical references for similar deep and large foundation pit supporting and dewatering projects.

44

The slope protection pile construction completion


55

Supporting effect of foundation pit

The project was completed safely and the construction quality was qualified, which met the national and industrial engineering construction acceptance specifications and the relevant requirements of the construction unit, ensuring the safety of surrounding buildings and urban roads; After the completion of the project, it will produce significant economic and social benefits, and provide technical reference for similar large-scale deep foundation pit support and dewatering projects.

5. FAQ

Q1: Why don’t use regular foundation pit support such as the slope supporting?

A: According to the situation on site, it is considered that under the premise of safety, the excavation quantity of earthwork should be reduced as far as possible, the project cost should be reduced and the occupation area should be reduced.

Q2:What is the purpose of construction monitoring?

A: In order to ensure the safety of the surrounding buildings, it is necessary to strengthen the monitoring during the construction, timely and accurately grasp the deformation situation, to ensure the safety of the surrounding environment, and timely feedback information, so as to achieve information construction.


Hot Tags: foundation pit dewatering project for architecture building, China, manufacturers, suppliers, factory, wholesale, price list, buy, for sale,

Previous: 
Next: 
CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-29-81778206 / 81778300
 After-sales Tel: +86-400-029-699
 E-mail: jingying@cctegxian.com
xiaoshou@cctegxian.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy