+86-29-81778206 / 81778300       jingying@cctegxian.com
Products & Services Company
You are here: Home / Products & Services / Underground Directional Drilling / Fault Detect
Fault Detect
Fault Detect Fault Detect

loading

Fault Detect

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button
1. Introduction From geophysical interpretation result, there is a fault (fault FD13 strike N89°E,Dip s 1°W,dip angle about 60 °,control length 1156 m, fault No. 2 Coal Seam, No. 3 coal seam, maximum drop 20m) in the north side of 22110 working face in Yaping Coal Mine. Directional drilling is...
Quantity:

1. Introduction

From geophysical interpretation result, there is a fault (fault FD13 strike N89°E,Dip s 1°W,dip angle about 60 °,control length 1156 m, fault No. 2 Coal Seam, No. 3 coal seam, maximum drop 20m) in the north side of 22110 working face in Yaping Coal Mine. Directional drilling is used for fault detect and verification.

2. Solution

By using directional drilling, sidetrack drilling technology and three-point-one-line identification method, the top and floor of coal seam and the position of fault are identified, and the spatial shape information of fault is obtained.

3. Construction situation

The drilling field is designed at 1300m in tailentry of 22110 working face.1# and 2# boreholes are arranged on the upper wall of the fault. Spacing between the boreholes is 1 m. Borehole start at 667 meter elevation, with 1.47m distance from the coal seam floor. The position of the borehole start point is about 300m from the fault interpreted by geophysical prospecting. Using the advance construction method, while constructing the main hole, the branch holes 2-1#, 2-2#, 2-3#,1-1#, 1-2# and 1#main holes and 2# main holes are successively constructed with a total drilling footage of 1060m.

4. Achieved accomplishment

Underground directional drilling is used to realize the precise detection task, and the construction of 2 main bore holes and 5 sidetracks has been successfully completed. Basing on the result, mining area of the working face was redesign and was enlarged by 56.4m. Thus, 53690t coal resource reserve was increased. It is shown that the difference between the exploration fault position and the actual exposure position is only 0.8m, which is much less than the design error and achieves the expected effect.

fault detect3

Trajectory diagram of 2# directional drilling borehole and sidetracks (profile)



Hot Tags: fault detect, China, manufacturers, suppliers, factory, wholesale, price list, buy, for sale,

Previous: 
Next: 
CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-29-81778206 / 81778300
 After-sales Tel: +86-400-029-699
 E-mail: jingying@cctegxian.com
xiaoshou@cctegxian.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy