+86-29-81778206 / 81778300       jingying@cctegxian.com
Products & Services Company
You are here: Home / Products & Services / Underground Directional Drilling / Gas Drainage Borehole Drilling
Gas Drainage Borehole Drilling
Gas Drainage Borehole Drilling Gas Drainage Borehole Drilling

loading

Gas Drainage Borehole Drilling

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button
1. Introduction As the mining area shifts to deeper area, and in order to adapt to the long-term production planning of the mine, the idea of "pre-mining gas pre-mining in large panels" was put forward in Baode Coal Mine. That is, adopt ultra-long distance inseam directional drilling...
Quantity:

1. Introduction

As the mining area shifts to deeper area, and in order to adapt to the long-term production planning of the mine, the idea of "pre-mining gas pre-mining in large panels" was put forward in Baode Coal Mine. That is, adopt ultra-long distance inseam directional drilling (more than 1500 meter deep) to carry out regional pre-drainage and reduce the gas content for medium and long-term plan coal field. It will relieve the hidden gas hazards for later mining and mining. Gas was pre-drained in the second panel of Baode Coal Mine, 81309, 81310, 81311, 81312, 81313 and other working faces of the third panel of the coal seam through the drilling of this coal seam in the 8th coal seam, to evaluate the technology and effect of the extraction system.

2. Treatment solution

Adopting ZDY12000LD drilling rig, ZDY6000LD(A) drilling rig, BLY460 mud pump truck and YHD3-1500 mud pulse wireless measurement while drilling system independently developed by CCTEG Xi’an Research Institute, Long distance inseam directional drilling borehole for gas drainage are conducted in 81309 , 81310, 81311, 81312, 81313 working face of Baode Coal Mine.

3. Construction situation

Undertake the gas drainage borehole drilling project of Shenhua Shendong Baode Coal Mine, mainly in the construction of coal seam gas area pre-drainage drilling in the second panel and third panel 81309, 81310, 81311, 81312, 81313 and other working faces of Baode Coal Mine. The total designed engineering volume is 460,000 m (of which, the directional gas pre-drainage borehole engineering volume is about 150,000 m, and the conventional gas pre-drainage borehole engineering volume is about 310,000 m). The conventional pre-drainage boreholes are constructed along the gate entry of the working face, and the boreholes are inclined along the No. 8 coal seam. The heights of the boreholes are between 1.2 and 1.6 m and the drilling depth is about 200 m.

4. Achieved accomplishment

As of the end of January 2020, 325,287 m has been completed, of which 97,834 m has been completed for directional borehole drilling and 227,453 m has been completed for conventional borehole drilling. The drilling quality is high and the extraction effect is remarkable, which guarantees the normal continuity of the mining faces and system roadways in Baode Coal Mine.

5. FAQ

Q1: What kind of work can your company do in this field?

A: We can solve the main gas drainage problems encountered in the process of mine exploration, construction, production and shutdown.

Q2: What are the advantages of your company compared with other companies?

A: We are committed to the design and construction of coal seam gas control in mines and have formed a complete set of coal seam gas control technology and equipment.


Hot Tags: gas drainage borehole drilling, China, manufacturers, suppliers, factory, wholesale, price list, buy, for sale,

Previous: 
Next: 
CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-29-81778206 / 81778300
 After-sales Tel: +86-400-029-699
 E-mail: jingying@cctegxian.com
xiaoshou@cctegxian.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy