+86-29-81778206 / 81778300       jingying@cctegxian.com
Products & Services Company
You are here: Home / Products & Services / Welling Drilling Engineering / Cluster Well Drilling
Cluster Well Drilling
Cluster Well Drilling Cluster Well Drilling

loading

Cluster Well Drilling

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button
1. Introduction CCTETG Xi’an Research Institute has constructed many coalbed methane wells in Liupanshui and surrounding areas of Guizhou Province. Major underground problems such as formation water inrush in well, repeat lost circulation, etc. was solved. Thus, a wealth of karst fracture...
Quantity:

1. Introduction

CCTETG Xi’an Research Institute has constructed many coalbed methane wells in Liupanshui and surrounding areas of Guizhou Province. Major underground problems such as formation water inrush in well, repeat lost circulation, etc. was solved. Thus, a wealth of karst fracture developed strata drilling and underground complex treatment experience were accumulated.

2. Treatment solution

For CBM exploration wells, a set of soft coal seam coring technology is explored, and the core recovery rate is over 85%. In view of the malignant leakage caused by the development of Karst Cave and karst fissure in Guizhou, on the basis of summing up rich construction experience, a series of technical problems have been solved. A set of effective plugging methods and techniques have been summarized, thus shortening the drilling cycle, reducing cost of lost circulation control. These research results lays a foundation for low-cost development and utilization of coalbed methane.

3. Construction situation

Cluster well drilling

4. Achieved accomplishment

Since 2015, a total of 6 CBM exploration wells and 29 CBM cluster wells have been constructed in Liupanshui area, Guizhou Province, with a cumulative footage of 34568m. Among these Coalbed methane wells, average single well depth is about 1000m. Drilling and completion cycle of a single well can be controlled within 15 days. The highest drilling efficiency is 486m footage per day. High-efficiency coalbed methane drilling in karst region is realized. Taking Zhong1-8-6 well as an example. As of the end of May 2019, average daily gas production exceeds 5000m3. Cumulative gas production is 1.8 million m3, which is still in a stable rising stage.

cccc

Three-dimensional trajectory map of Zhong 1-8-6 well



Hot Tags: cluster well drilling, China, manufacturers, suppliers, factory, wholesale, price list, buy, for sale,

Previous: 
Next: 
CCTEG Xi'an Research Institute (Group) Co., Ltd. was founded in 1956, with the mission of leading the progress of coal technology and supporting safe and efficient mining.

QUICK LINKS

ABOUT US

Leave a Message
Get A Free Quote

CONTACT US

 Tel: +86-29-81778206 / 81778300
 After-sales Tel: +86-400-029-699
 E-mail: jingying@cctegxian.com
xiaoshou@cctegxian.com
 Add: No.82, Jinye 1st Road, High-tech Industrial Development Zone, Xi 'an, Shaanxi
 Copyright ©️ 2024 CCTEG Xi'an Research Institute (Group) Co., Ltd. All rights reserved. Sitemap I Privacy Policy